Wednesday, 1 May 2013

Mumbai Metro trial run successful




MUMBAI: On the occasion of Maharashtra Day, Mumbaikars were treated to a successful trial run of the state's first Metro railway Wednesday.
Chief minister Prithviraj Chavan flagged off the 3-km long trial run of the Mumbai Metrobetween Versova and Azad Nagar in north Mumbai's Andheri suburb.
The section is a part of the 11.40km Versova-Ghatkopar corridor which will provide a vital east-west link and drastically reduce travel time from the existing 90 minutes to barely 20 minutes.
Chavan said that the Versova-Ghatkopar line will become operational by December.
He said the Metro would be extended to the adjacent Thane district and work on a separate monorail project expedited.
The Mumbai Metro's Versova-Ghatkopar first phase is being constructed at a cost of around Rs 2,356 crore by a Reliance Infrastructure-led consortium on behalf of Mumbai Metropolitan Region Development Authority (MMRDA).

Stations

This is a list of the stations of the planned Mumbai Metro.

Line 1: Versova – Ghatkopar

  • Versova
  • D N Nagar (Line 2 Interchange)
  • Azad Nagar
  • Andheri
  • WEH
  • Chakala
  • Airport
  • Marol Naka
  • Saki Naka
  • Asalpha
  • Ghatkopar

Line 2: Charkop – Mankhurd

  • Charkop
  • Malad
  • Kasturi Park
  • Bangur Nagar
  • Oshiwara
  • Samartha Nagar
  • Shastri Nagar
  • D N Nagar (Line 1 Interchange)
  • ESIC Nagar
  • JVPD
  • Juhu
  • Vile Parle
  • Nanavati Hospital
  • Aryasamaj Chowk
  • Khar
  • Barat Nagar
  • National College
  • Bandra
  • MMRDA
  • Income Tax Office
  • Cmplx Rd
  • Kurla
  • Barve Marg
  • RC Marg
  • Shivaji Chowk
  • BSNL
  • Mankhurd



No comments:

Post a Comment